EBT Group — Custom ERP for scaffolding
Every site, under control.
A custom ERP for EBT Group connecting surveys, estimates, quotes and crew scheduling with work on site.

The challenge
A scaffolding job requires several decisions before the first crew heads out. The surveyor checks dimensions and access, the estimator works out the configuration, and the planner coordinates assembly and dismantling. When those steps are separated, each person has to piece together the information for the same site.
How we solved it
We built the ERP around a single site record. Measurements, estimates, quotes and crew tasks belong to the same job. The schedule has a dedicated working view, while each task stays linked to the record that explains what needs to happen on site.
Survey and estimate in the site record
The surveyor adds dimensions, images and notes to the project. The estimate is linked to the same record, so the assumptions behind the scaffold configuration can be retrieved when preparing the quote.
Schedule assembly and dismantling separately
Assembly and dismantling have separate tasks, each with its own time slot and assigned crew. The planner can see where both visits fit into the schedule and return to the site record from either task.
Track site work with checklists and photos
Checklist answers, photos and site notes are stored with the project. A colleague who takes over the job later can find the information needed to prepare the next visit.
What the system makes possible
EBT Group can follow a job from the first survey through to final dismantling. Office and field teams have different working views of the same record, keeping crew schedules directly connected to the site history.
- 01Project files
- 02Crew planning
- 03Checklists & photos